Waterproofing inspection in Wyndham Vale

The membrane is all that stands between a shower and the timber frame behind it, and within days it is covered by tile. This visit checks it while it is still bare.

  • Membrane applied and cured, before the tiler sets out
  • About 1 hour on site
  • Report within 24 hours
Request your quoteChoose the inspection and we will come back to you with a price.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane applied and cured, before the tiler sets out
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Wyndham Vale waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Wyndham Vale builds

A failed shower is one of the most disruptive repairs in a finished home, because the tiles come off to reach it. Bond breakers, hob junctions and the height above a bath lip are where we find membranes falling short.

What we find at this stage in Wyndham Vale

  • Bond breaker missing at vertical junctions
  • Membrane torn or damaged before tiling
  • Bath hob junction not covered 40mm either side
  • Wall beside the bath not waterproofed 150mm above the lip
  • Shower niche base without a fall
Torn membrane in a wet area, caught before the tiler arrived, found during a waterproofing inspection in Lara
Torn membrane in a wet area, caught before the tiler arrived, Lara
A second shower junction without the required bond breaker, found during a waterproofing inspection in Lara
A second shower junction without the required bond breaker, Lara
Shower niche base formed flat, with no fall to shed water, found during a lock-up inspection in Hoppers Crossing
Shower niche base formed flat, with no fall to shed water, Hoppers Crossing
Sample findings

Sample defects found during our waterproofing inspections in Wyndham Vale

Annotated findings from Waterproofing inspections.

Bond breaker missing at a vertical shower junction under the membrane, found during a waterproofing inspection in Lara
Bond breaker missing at a vertical shower junction under the membrane, Lara
Waterproofing membrane damaged and needing repair before tiling, found during a waterproofing inspection in Lara
Waterproofing membrane damaged and needing repair before tiling, Lara
Bath hob junction not waterproofed 40mm either side, found during a waterproofing inspection in Lara
Bath hob junction not waterproofed 40mm either side, Lara
Wall beside the bath not waterproofed 150mm above the lip, found during a waterproofing inspection in Lara
Wall beside the bath not waterproofed 150mm above the lip, Lara

The other stages of a Wyndham Vale build

  1. Bored piers inspection in Wyndham Vale1Bored piersWith piers bored and cages in, before the concrete is ordered
  2. Slab pre-pour inspection in Wyndham Vale2Slab pre-pourThe day before the pour, when pods, mesh and underlay are all still open
  3. Frame inspection in Wyndham Vale3FrameFrame and trusses complete and roof on, before wall wrap and insulation
  4. Lock-up (pre-plaster) inspection in Wyndham Vale4Lock-up (pre-plaster)Roof, windows and external doors in, before the plasterer starts
  5. Fixing inspection in Wyndham Vale5FixingDoors, skirtings and cabinets in, before the painter arrives
  6. Pre-handover (PCI) inspection in Wyndham Vale7Pre-handover (PCI)Five to seven days before the practical completion date

All construction stage inspections in Wyndham Vale →

Guides

Construction stage guides for Wyndham Vale

All guides →

Book a waterproofing inspection in Wyndham Vale

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Wyndham Vale: common questions

Can't waterproofing be checked at handover?

Not without removing tiles. By then the membrane is completely hidden.

What standard applies to waterproofing?

AS 3740 for domestic wet areas, together with the NCC.

Do you do a flood test?

No. Flood testing is the waterproofer's job. We inspect the membrane visually and by hand.

Is this separate from the fixing stage?

Builders in Victoria often treat it as part of fixing. We can attend for either, or both.

The tiler is already laying tiles. Is it too late?

Call us anyway, but the more tile is down the less we can see.

Who fixes a membrane defect?

The waterproofer, before tiling. It is quick now and expensive later.