If your engineer has called for piers, the only time to check them is after boring and before concrete. Once poured, depth and cover are a matter of trust.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
Under Wyndham Vale's basalt clay the depth to firm material varies from lot to lot, and creek flats near Lollypop Creek can be softer. The pier depth on your drawing is the number that has to be met.
2Slab pre-pourThe day before the pour, when pods, mesh and underlay are all still open
3FrameFrame and trusses complete and roof on, before wall wrap and insulation
4Lock-up (pre-plaster)Roof, windows and external doors in, before the plasterer starts
5FixingDoors, skirtings and cabinets in, before the painter arrives
6WaterproofingMembrane applied and cured, before the tiler sets out
7Pre-handover (PCI)Five to seven days before the practical completion dateInstant online pricing, or talk to the booking team on 1300 471 805.
Usually well under an hour on a standard lot.
Then they cannot be inspected. This is the most time sensitive stage of all.
No. We report against the drawing. Sign-off belongs to the engineer and the building surveyor.
Many will not. Most estate homes sit on a waffle raft slab, and piers appear where the engineer needs to reach firmer ground.
The engineer's pier schedule for your lot, read with AS 2870.
Yes. It is one of the few times you can see what is under your house.